WHR Carriages

From Festipedia, hosted by the FR Heritage Group

Jump to: navigation, search

This article needs sorting - it contains data of vehicles old and new and north and south and artic (if you get my drift)

This page deals with WHR carriages in the preservation area. WHR Carriages (Pre preservation) deals with the carriages of the original WHR and its predecessor the NWNGR. See also WHR(P) Carriages


  • Original and replica carriages from the old WHR / NWNGR, including those based at the WHR (P)
Carriage 23 (NWNG Stock - NWNG No.11)
Carriage 24 (Replica of NWNG Summer Coach)
Carriage 25 (Replica of NWNG No.9) [under construction at WHR (P)]
Carriage 26 (NWNG Stock - NWNG No.12)
Carriage 29 (NWNG Stock - NWNG No.8) [WHR (P)]
Carriage 42 [WHR (P)]
Buffet Car (NWNG Stock - NWNG No.10) [under restoration at WHR (P)]


  • Operating carriages built new for the WHR (Caernarfon)
Carriage 2020
Carriage 2021
Carriage 2022
Carriage 2040
Carriage 2041
Carriage 2042
Carriage 2043
Carriage 2044
Carriage 2045
Carriage 2090
Carriage 2115 Bodysgallen (New Pullman stock)


  • Operating carriages originating elsewhere
Carriage 1001 (PW carriage ex Royal Navy Chattenden & Upnor Railway)
Parry People Movers - railcars using flywheel power on demonstration/trial


  • Operating carriages built new post-1955 for the Ffestiniog Railway and "depot transferred" to Dinas
Carriage 1000 (Formerly Carriage 100) (FR stock)
Carriage 101 (FR stock)
Carriage 113 (FR stock)


  • Stock Currently Under Construction (WHR (Caernarfon) )
Carriage 2060 (The Romanian carriage) Construction due to be completed soon.
Carriage 2010 (Service Car) (Previously due to be numbered 2091.) Construction started Dec 2007.
Carriage 2100 (Pullman Obs) Construction started Feb 2008.


  • Projected New Build Stock (WHR (Caernarfon) )
Carriage 2011 (Service Car) Construction start due possibly third batch
Carriage 2070 (Disabled Access) Construction start due possibly third batch
Carriage 2071 (Disabled Access) Construction start due possibly third batch


  • New Stock Planned but never built (WHR (Caernarfon) )
Carriage 2091 (Brake Saloon) Planned as a sister to 2090, but design changed before construction.

Timetable per the Carriage 2009 plan (v4) and Paul Lewin FR, and as modifiedE-group posting 34588 Updated to reflect construction starting on 2043 in July 2006, and the transfer of 2045 to the first batch of carriages, 4th August 2006. Updated to reflect latest changes Jan 2008.

[edit]Carriage Formations

These, due to the changes, have been moved to a separate page at WHR Carriage Formations


[edit]See also

Personal tools