Harbour Station

OSGrid:SH677439 Latt / Long :52.97657 / -3.9712


The station here was named after the lake created by the CEGB pumped storage scheme which flooded part of the line around 1960. The FR built the Deviation to by-pass this Lake.

Llyn Ystradau was the temporary terminus of the FR from 25th June 1977 (although public services did not commence until 8th July) until 24th June 1978, while the deviation was being completed further, and Tanygrisiau was subsequently opened on 8th July 1978, after which Llyn Ystradau was not used.

It was about 11ΒΌ miles from Porthmadog on the shores of the Tanygrisiau Reservoir (never called Llyn Ystradau by its owners), approximately midway between the new Moelwyn Tunnel and the intermediate summit of the line (at a height of 669 ft) behind the Ffestiniog Power Station.

On a cold but clear winter morningDate: Unknown  *Photo:    FR Co.
On a cold but clear winter morning
Date: Unknown *Photo: FR Co.
Laying the loopDate: June 1976  *Photo: Jim Hewett
Laying the loop
Date: June 1976 *Photo: Jim Hewett
Laying the platform edgeDate: 12th March 1977  *Photo: Jim Hewett
Laying the platform edge
Date: 12th March 1977 *Photo: Jim Hewett
The south end of the lakeDate: July 1976. *Photo: Brian Taylor
The south end of the lake
Date: July 1976. *Photo: Brian Taylor
Newly laid trackDate: July 1977   *Photo: Brian Taylor
Newly laid track
Date: July 1977 *Photo: Brian Taylor
Track adjustments prior to ballastingDate: July 1977   *Photo: Brian Taylor
Track adjustments prior to ballasting
Date: July 1977 *Photo: Brian Taylor