Site 3 cutting nearing completion and running through into Site 2
*Date: ?? Photo:Patrick Marks
Site 3 cutting was on the south side of the spiral and eventually broke though into
Site 2. It was the longest site on the first part of the spiral and eventually reached almost to
Rhoslyn Bridge.
Site 3 cutting, an early stage before the cutting was taken to its full depth. The cover enabled the worst of the weather to be avoided
*Date: Feb 1966 Photo:Patrick Marks
The latter stage of site 3 when the embankment had almost reached
Rhoslyn Bridge*Date: 1967 Photo:Patrick Marks